Preparation And Analysis Of Claims On Infrastructural Projects Using Primavera

  • Unique Paper ID: 163577
  • Volume: 10
  • Issue: 11
  • PageNo: 0-0
  • Abstract:
  • Construction claims have such high impacts on the project’s cost and time that the contractors should establish the effective claim management in their organizations. Nowadays, the substantially increasing volume of claims are the result of the rising complexity of the projects, the price structure of the construction industry and the legal approach taken by a lot of owners and contractors Claims are becoming an inevitable and unavoidable burden in modern projects involving new technologies, specifications and high expectations from the owner It is, therefore, imperative for all the parties to be fully acquainted with the procedures and systems, including recourse to certain preventive actions as found necessary and required. Changes in the construction field can be consolidated directly or converted to a full process project. This study aims to identify the method of using the PCM program and Primavera P6 to prepare the claims in a short time with less effort to produce fully documented claims
email to a friend

Cite This Article

  • ISSN: 2349-6002
  • Volume: 10
  • Issue: 11
  • PageNo: 0-0

Preparation And Analysis Of Claims On Infrastructural Projects Using Primavera

Related Articles

Impact Factor
8.01 (Year 2024)
UGC Approved
Journal no 47859

Join Our IPN

IJIRT Partner Network

Submit your research paper and those of your network (friends, colleagues, or peers) through your IPN account, and receive 800 INR for each paper that gets published.

Join Now

Recent Conferences

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024 Last Date: 15th March 2024

Submit inquiry